Hanau, Germany
Consolidation of all research / development laboratories (2000m²) from the Wehrheim site to the Kulzer GmbH headquarters in Hanau, into an existing, gutted industrial building.
Extended basic design incl. approval planning as well as turnkey realization of the trades laboratory furniture, climate chambers, pure media, ventilation, electrical, media, BMS, steel construction and interior finishes
Design: 07/21 – 02/22
Execution: 03/22 – 05/23
OTTO Life Science Engineering GmbH
Forchheimer Straße 2
D-90425 Nürnberg
Tel.: +49 (0) 911 376737-0
Fax: +49 (0) 911 376737-99
info@otto-lse.com